Public comment is invited on the draft scoping requirements for the Victorian Renewable Energy Terminal Environment Effects Statement (EES).
The Terminal, proposed by the Port of Hastings Corporation, would be a dedicated primary assembly port, designed to provide offshore wind port capacity for both wind turbine and foundation components. Longer term, the facility may be used to support maintenance, repowering and decommissioning activities of the offshore wind infrastructure.
Visit Engage Victoria to download the draft scoping document including a map of the project location.
Submissions Open until the 11 December